2016 December Cisco Official New Released 700-070 Dumps in Lead2pass.com!
100% Free Download! 100% Pass Guaranteed!
I have already passed Cisco 700-070 certification exam today! Scored 989/1000 in Australia. SO MANY new added exam questions which made me headache….. Anyway, I finally passed 700-070 exam with the help of Lead2pass!
Following questions and answers are all new published by Cisco Official Exam Center: http://www.lead2pass.com/700-070.html
QUESTION 11
What is the maximum image resolution of the 4K UHD camera display in the IX5000?
A. 1080p60
B. 1280p60
C. 1080p30
D. 720p30
Answer: A
Explanation:Explanation:
Video resolution
Native support up to 1920 x 1080p, 60 fps
Content frame rate
Content sharing up to 1920 x 1080p resolution, 30fps
QUESTION 12
Using Auto Collaborate with a Cisco TelePresence endpoint, what resolution should the laptop share?
A. 800 x 600 60 Hz
B. 800 x 600 70 Hz
C. 1024x76860Hz
D. 1024x76850Hz
E. 1600 x 1200 60 Hz
Answer: C
QUESTION 13
Which Cisco TelePresence deployment model requires a Session Border controller?
A. Intra-Campus
B. Intra-Enterprise
C. Inter-Enterprise
D. Multipoint
E. Multi-Cluster Cisco Unified Communications Manager
Answer: C
QUESTION 14
What should you do first when Self View display issues occur?
A. Close and re-open Self View.
B. Use the Setup wizard to repeat system setup.
C. Close and re-open the share tray.
D. Power-cycle the system.
Answer: A
QUESTION 15
What are the room power requirements?
A. 1.0 kW for the system, plus 1.0 kW for all table-participant devices
B. 0.95 kW for the system, plus 0.95 kW for all table-participant devices
C. 0.95kW for the system, plus 1.0 kW for all table-participant devices
D. 1.0 kW for the system, plus 0.95 kW for all table-participant devices
Answer: C
Explanation:
Power 0.95kW of power for system. 1.0kW provisioned for all table participant devices. The IX5000 utilizes NEMA-5-15P electrical outlets for standard US installations.
QUESTION 16
What three ways can you connect an endpoint to a Static meeting on the Cisco TelePresence Multipoint Switch? (Choose three.)
A. CTS uses One Button to Push
B. CTS systems manually dial
C. meeting administrator adds CTS systems using the WebUI
D. system administrator dials the CTS system into the meeting using the CTS CLI
Answer: BCD
QUESTION 17
Which protocol is used by the Cisco TelePresence Multipoint Switch to instruct Cisco TelePresence endpoints to stop transmitting video during an active multipoint call?
A. RTSP
B. RTCP
C. SIP
D. H.323
Answer: B
QUESTION 18
What should you do when upgrading an existing immersive room to an IX5000?
A. replacing all lighting
B. replacing all carpeting or flooring
C. repainting the room if mounted items are removed
D. removing acoustic tiles
Answer: C
QUESTION 19
What should you do first when the cameras are blurry?
A. Close and re-open Self View
B. Use the Setup wizard to repeat system setup.
C. Close and re-open the share tray.
D. Power-cycle the system.
Answer: A
QUESTION 20
What is the proper order of steps for installing an IX5000?
A. Perform cable routing, install display frames, install tabletops, and install the codec.
B. Install tabletops, perform cable routing, install display frames, and install the codec.
C. Install display frames, install the codec, perform cable routing, and install tabletops.
D. Install display frames, install tabletops, perform cable routing, and install the codec.
Answer: C
Explanation:
Installation Quick Reference
1. Move material and unpack (2 people required)
2. Install the lower display frames (2 people required)
3. (Systems that include seismic brackets only) measure, drill for, and install the seismic brackets (see the “Installing the Seismic Bracket” chapter on page C-1) (2 people required). Note that this step adds extra time to the installation.
4. Install the upper display frames (2 people required)
5. Install the cable runner
6. Install the upper crossbars, rear kick plates, and toe caps
7. Install the codecs, PDUs, subwoofer, speakers, and optional endpoint switches into the endpoint structure Note: The switches in the endpoint structure are optional items. The switches in the table legs to connect the Touch 10 device(s) are required for the Touch 10 device(s).
8. Install the table legs and electronic equipment (Ethernet/power modules for table legs, microphone connector (MC), PoE switch) for the front row table, and begin cabling procedures for the table (2 people required for some steps)
9. Perform cable routing for all installed equipment (codecs, PDUs, subwoofer, and speakers for the endpoint structure, and power/ laptop connectivity and PDUs for the table legs) AND place the cables for the light panels and camera
10. Install the displays, light panels, and camera, including cabling
11. Install the front kick plates and toe caps
12. Installl the front row tabletops (2 people required)
13. Install and cable the microphone bars, mute buttons, retractors/presentation cables
14. (IX5200 systems only) install and cable the second row table (2 people required for some steps)
15. Install the PET, fascias, display trim and thermoformed outer panels (2 people required)
16. Install software, register endpoint to Unified CM, perform first-time setup, run test calls
17. Room cleanup
http://www.cisco.com/c/dam/en/us/td/docs/telepresence/ix5000/assembly_guide/ix5000_install_guide.pdf
Lead2pass 700-070 PDF dumps is perfect! Totally! Thanks so much!
700-070 new questions on Google Drive: https://drive.google.com/open?id=0B3Syig5i8gpDenhEenBHcHdMakk
2016 Cisco 700-070 exam dumps (All 60 Q&As) from Lead2pass:
http://www.lead2pass.com/700-070.html [100% Exam Pass Guaranteed]